Download Print this page

American Standard SELECTRONIC 606B2 Series Installation Instructions Manual page 4

Concealed toilet flush valve 1.1. 1.28 & 1.6 gpf, exposed back spud/concealed back spud/top spud

Advertisement

FLUSH VALVE INSTALLATION
INSTALL ELECTRICAL BOX; Fig. 3
1
1. Cut a 127x127mm (5"x 5") opening in finished wall for
ELECTRICAL BOX (1) at the dimension shown.
2. Rotate the 4 MOUNTING TABS (2) flat against the
electrical box. Holding the MOUNTING TABS (2) in
position, install the ELECTRICAL BOX (1) into the
opening. Make sure the MOUNTING TABS (2) are
behind the wall.
3. Tighten the 4 MOUNTING SCREWS (3) until the
ELECTRICAL BOX (1) is almost secure in the wall.
Before tighting fully, rest a level at the top edge of the
ELECTRICAL BOX (1) and make sure the box is level.
4. Cut a 2" diameter hole for outlet pipe at dimension
shown.*
2
INSTALL SWEAT ADAPTER; Fig. 4
Turn water supplies off before
CAUTION
beginning
Note: Stop Valve inlet is 1" NPT. For optional sweat
connection, install Sweat Adapter (1) (Supplied) for 1"
copper pipe supply line.
1. Clean the end of the supply pipe. Push the threaded
SWEAT ADAPTER (1) until it is seated against the
internal stop. Sweat the ADAPTER (1) to the pipe.
2. Install the STOP VALVE (2) to the water supply line
with the outlet positioned as required (Behind the Wall).
3. Support piping as required.
3
FLUSH OUT SUPPLY LINES; Fig. 5
1. Open STOP VALVE (1).
2. Turn on water supply line to flush line of any debris or
sediment.
3. Close STOP VALVE (1) and turn off water supply line.
Fig.3 (TOP SPUD FIXTURE ILLUSTRATED)
127mm
(5)
127mm
(5)
360mm MAX.
(14-3/16) MAX.
128mm MAX.
(5) MAX.
Fig. 4
115mm-134mm
(4-1/2 TO 5-1/4)
STOP
VALVE
OUTLET
Fig. 5
COUNTER-CLOCKWISE
OPENS STOP VALVE
4
2
3
T O P
1
*FOR HOLE LOCATION OF
OUTLET PIPE ON BACK INLET
FIXTURES, REFER TO FIXTURE
BEING INSTALLED FOR CORRECT
HEIGHT FROM FINISHED FLOOR
2
1
STOP VALVE
FILE
(1" NPT)
EDGES
CLEAN & SOLDER
TO ADAPTER (1)
2
CLOCKWISE CLOSES
STOP VALVE
1
M965640 Rev. 1.4 (11/17)

Advertisement

loading