Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. All American Standard Products Are Water Tested At Our Factory. UNPACKING Some Residual Water May Remain In The Valve During Shipping.
Top Spud Fixtures WALL 160mm 127mm X 127mm (6-1/4) (5X5 CUTOUT FOR BOX) CAUTION: Use only American Standard DETECTION ZONE supplied transformers and cable sets. 400mm-800mm Using non-AS supplied cables, or cutting, (Factory Setting: 400mm) 160mm splicing or modifying any components will...
Page 4
Fig.3 (TOP SPUD FIXTURE ILLUSTRATED) FLUSH VALVE INSTALLATION 127mm INSTALL ELECTRICAL BOX; Fig. 3 127mm 1. Cut a 127x127mm (5"x 5") opening in finished wall for ELECTRICAL BOX (1) at the dimension shown. 2. Rotate the 4 MOUNTING TABS (2) flat against the T O P electrical box.
Page 5
INSTALL VACUUM BREAKER AND Fig. 6 FLUSH CONNECTIONS; Fig. 6 1. Place the SPUD FLANGE (1) over the spud on the Fixture. Fig. 6. 1-1/2" TOP SPUD 2. Place FRICTION WASHER (3) and SEAL WASHER (4) inside SPUD COUPLING NUT (2) and thread onto Spud. Do not tighten fully.
Page 6
INSTALL FLASH VALVE; Fig. 7 Fig. 7 Insert the side ADJUSTABLE TAILPIECE (1) on the FLUSH VALVE (2) into the STOP VALVE (3). Lubricate the TAILPIECE O-RING (4) with water if necessary. Thread the COUPLING NUT (5) onto the STOP VALVE (3) and tighten lightly.
ELECTRICAL INSTALLATION Fig. 9 T O P STANDARD BATTERY POWER KIT (PK00.CRP); Fig. 9, 10 1. Attach the SAFETY CHAIN (1) from the COVER PLATE (2) to the MOUNTING POST (3) as shown. Fig. 9. 2. Connect one end of the 27" EXTENSION CABLE (1) to SENSOR CABLE (2).
Page 8
5. Place Y-ADAPTERS (3) into respective electrical box. 6. Plug in AC power supply into wall outlet once all daisy-chain unit connections have been made. CAUTION: Use only American Standard supplied transformers and cable sets. Using non-AS supplied cables, or cutting, splicing or modifying any components will void the warranty.
Page 9
INSTALL COVER PLATE; Fig. 12 Fig. 12 Install the two TABS (1) on the back side of COVER PLATE (2) into the two SLOTS (3) located on the top edge of the ELECTRICAL BOX (4). Push on the bottom edge of the COVER PLATE (2) until it snaps into place.
MAINTENANCE Fig. 14 INSTALL NEW BATTERY; Fig. 14 1. Remove the COVER PLATE (1). For removing front panel instructions, see Step 10. 2. Remove old BATTERY (2) from BATTERY HOLDER (4). Install the new BATTERY (3), making sure the shape of the BATTERY (2) follows the shape of the BATTERY HOLDER (4).
Page 11
SET DETECTION RANGE (if required); Fig. 16 & 17 Fig. 16 Note: The detection distance is preset and ideal for most installations. Should an adjustment be required, follow the steps below. 1. Remove COVER PLATE (1). See Step 10 for front panel removal instructions.