Accessory Installation Before Operating 11 - Baumatic BBCSZ150GL User Manual

Single zone beverage centre
Table of Contents

Advertisement

Accessory installation before operating
UNPACKING AND CLEANING THE BEVERAGE CENTRE
• Make sure that it has been installed by a suitably qualified person, as
per the information contained in Baumatic's installation instructions.
• Let the appliance stand upright for approximately 2 hours before
connecting it to the mains supply. This will allow any refrigerant
gasses that may have been disturbed during the transportation
process to settle.
• The outside of the appliance and the removable accessories contained
within it, should be cleaned with a solution of liquid detergent and
water.
• The interior of the appliance should be cleaned with a solution of
sodium bicarbonate dissolved in lukewarm water. The interior and
accessories should be thoroughly dried, after the cleaning process has
been completed.
• There can be an odour when you first switch on the appliance. It will
lessen as the appliance starts to cool.
LOCK THE DOOR
● Your appliance has a lock for the door and a key should be attached
inside the packing of this User Manual.
Insert the key into the lock and turn it counter-clockwise to unlock
the door. To lock it, please follow the reversed operation. Please save
the key well.
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bbcsz150ss

Table of Contents