6. Connect the AIM ODU F connector at the
location in the distribution network where you
want to test.
7. Press NEXT to go to the TRANSPONDER
SURVEY screen.
8. If the installation includes two ODUs, highlight
the ODU to test and press SELECT to
continue.
9. If you want to select an individual polarity for
the transponder survey, do the following:
Press OPTIONS.
•
•
On the TR SURVEY OPTIONS screen,
highlight the polarity for the survey.
•
To continue, press SELECT to go to the
TRANSPONDER SURVEY screen.
AIM 2 Operation Manual
Page 82
Need help?
Do you have a question about the Advanced Installation Meter 2 and is the answer not in the manual?
Questions and answers