5. Use the left/right arrow buttons to position the
image of the AIM under the location where you
are testing.
6. Connect the AIM ODU F connector at the
location in the distribution network where you
want to test. Then press NEXT to go to the EIV
PLUS TEST screen.
To test between the ODU and the multiswitch,
disconnect the cable connecting the ODU to
the multiswitch and connect it to the AIM's ODU
F connector.
If the installation includes two ODUs, the EIV
PLUS screen appears. Highlight the ODU for
which you want to perform EIV Plus and press
SELECT to go to the EIV PLUS TEST screen.
AIM 2 Operation Manual
Page 75