SECTION 6 - ACCESSORIES
• Use correct rod size and current settings.
• Do not use electrical cords without ground.
• Do not use electrical tools in water.
• Do not weld to the platform.
• Do not ground through the platform.
• Do not use a high frequency arc starter with TIG welder.

Preparation and Inspection

• Connect ground clamp to metal being welded.
• Ensure there is a good ground connection and observe
proper polarity.

Operation

Start the engine, turn on the generator, then turn on the welder.
See the Miller Welder Owner's Manual (PN 3128957) for more
information.
6-14
6.8

SOFT TOUCH

A padding kit is mounted to the platform rails and to a frame sus-
pended below the platform. Limit switches deactivate platform
functions when the padded framework contacts an adjacent
structure. A button on the platform console allows override of the
system.
OVERRIDE INDICATOR
LIGHT
LIMIT
SWITCH
OVERRIDE BUTTON
RAIL BUMPER
SUSPENDED FRAME AND RAIL BUMPER
3121627
LIMIT
SWITCH