Quadra-Fire 4300 Series Installation Manual page 21

Automatic combustion control (acc)
Table of Contents

Advertisement

Figure 21.1
Door latch with the
ash door rod locked
in place
Figure 21.2
Insert two bolts through ARS
Channel, Appliance, Gasket, and
ARS Door Assembly; secure with
two nuts.
Figure 21.3
August 13, 2018
Knob
Ash Door Rod shown
in installed position
7037-172G
4300 Wood Appliance Series ACC
Ash Removal
Spacer
Figure 21.4
Ped Kit and Ash Removal System (Cont'd)
Installing Ped Kit
1. Follow Begin installing the ARS System instructions
provided on page 21.
2. Slide pedestal over adapter on bottom of appliance
and secure with bolts from heat shield (Figure 23.1 on
page 23).
3. Install ARS Spacer on left hand side with one bolt using
Phillips head screwdriver (Figure 22.4).
4. Carefully stand appliance up and place in desired
location.
Finishing the ARS Installation
1. Replace front bricks that were removed in step 1 of
Begin installing the ARS System on page 18 (Figure
23.2 on page 23).
2. Install the ash drawer to pedestal base.
3. Install ARS access cover inside of ARS Channel that is
located inside the firebox (Figure 23.2 on page 23).
CAUTION!
CHECK BAFFLE BOARDS & CERAMIC BLANKET!
Verify that the baffle boards and ceramic blanket are
in their proper locations.
It is important that the baffle boards and ceramic
blanket are correctly installed for proper burn safety.
NOTE: If installing a floor installation of an outside air kit
on a Step Top model with a pedestal assembly you
must attach the enclosed cover plate with 4 screws
to the back of the appliance. Other wise you may
discard this piece (Figure 23.3 on page 23).
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents