SUN2000-45KTL-US-HV-D0
User Manual
Figure 6-25 Binding communications cables
Step 7 Secure the fitting to the conduit.
Step 8 Clear debris from the maintenance compartment.
Please do not leave any extra material in the maintenance compartment.
----End
6.6.2.2 Connection Through a Waterproof Connector
Procedure
Step 1 Remove an appropriate length of the jacket and core wire insulation layer from the
communications cable using a wire stripper.
Issue 04 (2018-06-01)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Electrical Connections
62