Assembly
(1) Fix Lead unit (a) in the lead wire holders of Arm (b) and Arm cover (c). (Fig. 20)
Fig. 20
Switch unit
(c)
(2) Be sure to insert Wave washer 20 beneath Throttle lever. (Right photo of Fig. 17)
(3) Insert Sleeve 7 (d) into Arm base (g) while aligning the flats of the two parts. (Fig. 21)
Fig. 21
(4) Pass Control cable (e), Lead unit (a), and Corrugated tube through at the position indicated in the right photo of Fig. 18.
(5) Insert Arm rubbers (f) (they are identical, and the orientation does not matter), and then attach Arm cover (c)
(a)
(f)
(e)
(f)
Connector
(g)
(b) and Flat washer 12
go between (b) and (g).
(d)
Makita Corporation
(b)
P 12/ 35
.