System Description

5.7 Sealing

This chapter describes the important sealing locations and sealing process
as required by MID certificate T10335 ( see also Chapter
Requirements
[p.63]). Even if MID is not required it is advised to seal the
UFM.
5.7.1

Main Plate

Figure
5-10
displays how the main plate is sealed to the flow cell:
Figure 5-10: Seal on the main plate to the flow cell
5.7.2

SPU

The SPU in the main compartment of the flameproof certified box is sealed
in 2 locations.
By means of the PCB sealing bracket the SPU electronics is sealed
to the flameproof certified box. Please see Figure
Page 26 of 68
Operation and Maintenance
5
12 MID
5-11
below.
UFM Series 6
Q.Sonic-plus

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q.sonic plus

Table of Contents