GENERAL INSTRUCTIONS FOR FLUE SYSTEM

▪ Flue pipe installed crimp/narrow end down
▪ Outer casings installed crimped/narrow end up. (Critical when exposed above the roof)
▪ Inner casings - direction not critical
▪ Flue pipes - seal all joints including firebox spigot.
Hearth & Home Technologies welcomes you to our tradition
- fix with a minimum of 3 stainless steel rivets
of excellence! In choosing a Quadra-Fire appliance, you
▪ Flue pipe spacers - affix to flue pipe
have our assurance of commitment to quality, durability, and
▪ Flue system termination point - Refer to AS/NZS 2918:2001 4.9.1.
performance.
▪ Flue pipe shall extend not less than 4.6m above top of the floor protector as per
This commitment begins with our research of the market,
AS/NZS 2918:2001 4.9.1(a)
including 'Voice of the Customer' contacts, ensuring we
make products that will satisfy your needs. Our Research
▪ Façade or chase systems - same rule applies as above.
and Development facility then employs the world's most
▪ Roof penetration and flashing method refer to NZ Building Code E2.(From 01/07/05)
advanced technology to achieve the optimum operation of
Note: These instructions apply to 150mm diameter flue pipe systems as tested to
AS/NZS 2918:2001
1. Either locate the appliance in position or by measuring at the ceiling mark the flue pipe centre position.
This appliance has been TESTED TO AS/NZS4013 for Hardwood by Vipac Report # 30A-14-0102-TRP-361517-0 Date tested: April 2015
Check that the outer casing is unobstructed through the attic space or roof area.
2. Spike the centre with a nail. Transfer this position to the next surface above. Plumb bob/laser.
MODEL QUADRA-FIRE 5700 step top acc Freestanding Wood Stove
3. Cut out the ceiling penetration hole – square or rectangle – short axis equals outer casing diameter
plus 50mm, long axis as required. See Table 5 . Perform the same at the roof penetration.
OVERALL AVERAGE EFFICIENCY BURNING SOFTWOOD
WHEN TESTED IN ACCORDANCE WITH AS/NZS 4012: .........................................................
4. Frame out the hole with minimum 75 x 50 timber or as required for roofing material. Minimum
AVERAGE PARTICULATE EMISSION FACTOR BURNING SOFTWOOD
requirement at roof penetration see NZ Building Code E2 Acceptable Solution (from 01/07/05).
WHEN TESTED IN ACCORDANCE WITH AS/NZS 4013: .........................................................
5. Install the outer casing so that :-
MAXIMUM AVERAGE HEAT OUTPUT BURNING SOFTWOOD:
(i) lower end is flush with the underside of the ceiling material and
APPROVED FUEL:
(ii) with the addition of metal "L" brackets, affix to the outer casing at 90 degrees secure the outer
Wetback - All Models: .........................................................................................
casing centrally to the ceiling and roof nogs. Alternatively substitute the "L" brackets for 25mm thick
Manufactured By: ...............................................................................................Hearth & Home Technologies, 352 Mountain House Road,
non heat sensitive packers. Secure the outer casing through the packers with horizontal fixings to
the nogs. Refer to the General Instruction for termination height. The option of outer casing slips to
Serial No. /
HF
be taken into account.
N
de série:
o
6. Flash the outer casing to the roof material with the appropriate approved flashing.
NOTE:
7. If using an outer/inner casing combination, now install the inner casing ensuring it extends a minimum
PERFORMANCE MAY VARY FROM TEST VALUES DEPENDING ON ACTUAL OPERATING CONDITIONS.
U.S. ENVIRONMENTAL PROTECTION AGENCY
200mm above the high side of the roof penetration. If not using a combination see '11' below.
Export stove. May not be operated within the United States
8. Refer to Firebox Installation, points 1 & 2.
9. Prepare the ceiling plate and place upside down over the flue spigot.
10. Install the flue pipes by preferred method – either up or down the outer casing. Affix each length
per the notes in General Instructions (above). Extend the flue pipe above the outer
casing to suit the casing cover/cowl assembly.
11. If the inner casing has not been installed, install now. Refer to 7 above for minimum height.
12. Install the cowl assembly, i.e. Top spacer, casing cover and cowl.
13. Position and secure the ceiling plate with the screws and spacers.
14. Wipe the flue pipe to remove finger marks.
15. Refer to Firebox Installation, point 3.
16. If flue offset is required, refer to AS/NZS 2918:2001 4.1
Page 10
19 January, 2018
Page 2
REVISIONS
and Welcome to the Quadra-Fire Family
5700 STEP TOP ACC
ACC WOODFIRE COMPLIANCE LABEL
...............................................................................................................
BARCODE LABEL
ECO #
DATE
BY
our stoves, inserts and fireplaces. And yet we are old-fash-
ioned when it comes to craftsmanship. Each unit is meticu-
lously fabricated and surfaces are hand-finished for lasting
beauty and enjoyment. Our pledge to quality is completed
as each model undergoes a quality control inspection.
We wish you and your family many years of enjoyment in
the warmth and comfort of your hearth appliance. Thank
you for choosing Quadra-Fire.
65%
1.5 g/kg
12.7 kW
..........................
BURN ONLY HARDWOOD WITH A MOISTURE CONTENT
LESS THEN 25% (dry basis).
Halifax, PA 17032, United States of America
Date of Manufacture / Date de fabrication:
2017 2018 2019 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
UNLESS OTHERWISE SPECIFIED DIMS ARE INCHES[MM] & : TOLERANCES ARE: (2) PLACE DEC : ± 0.03
OUTSIDE MATERIAL.
NORMAL DIM & INSIDE MATERIAL.
7038-201G
7038-201G
7038-201G
CONFIDENTIAL PROPERTY OF HEARTH & HOME TECHNOLOGIES INC.
5700 Step Top ACC Wood Burner
!
ITEM
PART NUMBER
INSTALLATION
DATE:
OUTSIDE APEX
PART NAME:
DRAWN BY:
SCALE:
THIS PRINT IS CHECKED AND CONTROLLED BY THE ENGINEERING
DEPARTMENTS OF HEARTH & HOME TECHNOLOGIES INC.
PART NAME
7038-200_R4
(3) PLACE DEC: ± 0.005
ANGLE: ± 2°
INSIDE APEX - DIMS ENCLOSED BY AN OVAL ARE CR
1 May, 2019
Page 7
MATERIAL:
19 January, 2018
SHEET:
PART NU
FR

Advertisement

Table of Contents
loading

Table of Contents