Indicator Led And Cable - IBM Aptiva Hardware Maintenance Manual

Machine type 2137, 2138 and monitors type 2122, 2124, 2126 and 2127 for service level a
Hide thumbs Also See for Aptiva:
Table of Contents

Advertisement

Indicator LED and Cable

Push in on the indicator LED and remove from the rear.
Disconnect the LED and cable from the system board.
Figure 4- 30 Remove the LED indicator
NOTE: When reinstalling the LED assembly, please be note, the EMI core
should be approximately 20mm from lower cable tie.
4-28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents