Operation Procedure Of Test Marking And Run Mode - Panasonic LP-400 Series External Control Manual

Laser marker
Hide thumbs Also See for LP-400 Series:
Table of Contents

Advertisement

1-1-1 Operation procedure of test marking and run mode

This section describes the basic operation procedures with the display operation connected to the controller.
⿎ Flow chart
For test marking
File selection
Edit the file
Turn on laser pumping. (Complete in 15 to 20 sec.)
Start test marking
Open internal shutter. (Self-opening)
Marking (Laser radiation)
Save the file.
Turn off laser pumping.
Turn off power.
14
Turn on power with key switch on controller.
ME-LP400V-EX-6
Edit and overwrite the file
Select file to use in run operation.
Start run operation.
Marking trigger input
Input TRIG. IN (A4) on I/O terminal to start marking.
For run mode operation

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents