Start Up; Preliminary Operations - Promax OD-514B Instruction Manual

Dual-channel oscilloscopes
Table of Contents

Advertisement

4.2 Start Up

4.2.1 Preliminary Operations

Before switching on the instrument, perform the following operations and checks:
1. Set the controls as indicated:
CONTROL
VERT MODE
CH2 INV
   
VOLTS/DIV
VARIABLE
AC/GND/DC
SOURCE
COUPLING
TRIG.ALT
LEVEL LOCK
HOLDOFF
TRIGGER MODE
HORIZ. DIS. MODE
TIME/DIV
SWP.UNCAL
   
x10 MAG
Connect power cord to power input connector [47], then connect it to an AC line
outlet suitable for the instrument previously set AC line voltage, and then continues as
follows:
1. Press the I/O switch [9]. The POWER led [8] will be on. In about 20 seconds, a
trace will appear on the CRT screen. If no trace appears in about 60 seconds,
check the switch and control setting (previous table).
2. Adjust the trace to an appropriate brightness and image with INTEN [2] and
FOCUS [4] control knob respectively.
Page 18
I/O
[9]
INTEN
[2]
[4]
FOCUS
ILLUM
[6]
[39]
CHOP
[41]
[36]
[40][37] Mid-position
POSITION
[10][14] 0.5 V/DIV
[13][17] CAL (clockwise position)
[11][15] GND
[26]
[25]
SLOPE
[22]
[24]
[29]
[31]
[28]
[38]
[18]
[30]
[34]
POSITION
[33]
X-Y
[27]
OD-514B, OD-515B & OD-545B INSTRUCTION MANUAL
STATE
OFF (disengaged)
Mid-position
Mid-position
Full anti-clockwise position
CH1
Released (ALT)
Released
CH1
AC
+
Released
Pushed in
MIN (anti-clockwise)
AUTO
A (OD-545B only)
0.5 ms/DIV
Released
Mid-position
Released
Released
Table 1
November 2000

Advertisement

Table of Contents
loading

This manual is also suitable for:

Od-545bOd-515b

Table of Contents