Part 7 Trial Operation And Field Settings - Daikin FTXR-T Series Service Manual

Inverter pair
Hide thumbs Also See for FTXR-T Series:
Table of Contents

Advertisement

1. Pump Down Operation............................................................................125
2. Forced Cooling Operation .......................................................................126
3. Trial Operation ........................................................................................127
4. Field Settings ..........................................................................................129
5. Silicone Grease on Power Transistor/Diode Bridge................................132
124
Trial Operation and
4.1 Temperature Display Switch .................................................................... 129
4.2 When 2 Units are Installed in 1 Room...................................................... 129
4.3 Jumper and Switch Settings..................................................................... 130
Field Settings

Part 7 Trial Operation and Field Settings

SiUS041829E
Part 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents