7. Cable Connection
7-2. The caution for Cabinet installation and Cable connection(Full Front)
1) The set installation order Must be Center to Left/Right direction.
→ The set installation order and The cable connection order are different.
2) After installing cabinets one line is complete, make sure the connection is OK
by connecting OCM/Power cable. Then, Install next line.
3) In case of connecting OCM cable upward, Connect OCM cable to Lower set first.
4)
The two output of Interface gender should be connected to First cabinet and Last cabinet each
→ Interface Gender should be installed at Left-Center side of LED wall
(Within 2~4M compared to first and last cabinet for connecting OCM cable)