Mast Couplings and Guying Points

There are two methods of coupling two sections of mast:
1. The U-Bolt set uses two stainless steel U-Bolts to clamp the two masts together. (Figure 39)
2. The inline coupling fixes the upper and lower mast sections together and provides guying
points and an exit point for the HVSC downconductor.
U-Bolts and Inline Couplings nuts must be tightened to no more than 55kg/cm (45in.lb).
Figure 39.