The hoistway must be designed and built in accordance with the "Safety Code for Elevators and Escalators"
o
(ASME A17.1) and all state and local codes.
Due to close running clearances, the owner/agent must ensure that the hoistway and pit (where provided) are
o
level, plumb and square and are in accordance with the dimensions on these drawings.
Owner/agent must ensure the minimum overhead clearance is in compliance with codes.
o
Owner/agent to provide all masonry, carpentry and drywall work as required and shall patch and make good
o
(including fi nish painting) all areas where walls/fl oors may need to be cut, drilled or altered in any way to
permit the proper installation of the lift.
Contractor/customer to verify all dimensions and report any discrepancies to our offi ce immediately.
o
Structural engineer to assure that the building and shaft will safely support all loads imposed by the lift
o
equipment. Refer to the tables on the installation drawings for loads imposed by the equipment.
o
Suitable lintels must be provided by the owner/agent. Door frames are not designed to support overhead wall
loads.
Power supply with a lockable fused disconnect and auxiliary contact to brake the battery feed, or circuit
o
breakers with a 3-pole breaker for battery feed required in compliance with electrical code (contact your
Savaria dealer or refer to the table below for OEM part numbers).
Disconnect Switch Types & Accessories
2 Pole Solid Neutral 240V 1 PH
Required Auxiliary Contact
Required Type "D" Fuse (Buss type "FRN" or equal)
3 Pole Solid Neutral 208V 3 PH
Required Auxiliary Contact
Required Type "D" Fuse (Buss type "FRN" or equal)
1 Pole Solid Neutral 120V 1 PH
Required Type "D" Fuse (Buss type "T" or equal)
Permanent power of 240V single-phase 40 Amp or 208V three-phase 30 Amp must be supplied by others
o
before installation.
Remote hall call (when supplied) to be installed by the owner/agent at 42" from the landing fl oor.
o
Entrance assemblies must be adjusted to align with the platform and interlock equipment. Others to allow an
o
adequate rough opening.
o
Entrance assembly must be securely fastened to walls by the elevator contractor.
Part No. 000682 15-m10-2015

ORION STANDARD NOTES

HOISTWAY
MINIMUM OVERHEAD CLEARANCE
CONSTRUCTION SITE
DIMENSIONS
STRUCTURAL
ELECTRICAL
1 PHASE 5 H.P. Pump Unit
3 PHASE 5 H.P. Pump Unit
Cab Lighting
ENTRANCES
Cutler Hammer
Federal Pioneer
1HD222N
1622SN
DS16CP
E1K-1AEV-W94
2@40 amp
2@40 amp
1HD321N
1332SN
DS16CP
E1K-1AEV-W94
3@30 amp
3@30 amp
GP 111N
86211
1@15 amp
1@15 amp
Siemens
ID322
MSSAK 116
2@40 amp
ID321
MSSAK 116
3@30 amp
CFN 211
1@15 amp
Page 25 of 27
Orion Planning Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents