8.6.5
C
vertical concentric flue assembly
33
Model
Description
EF80
Vertical Concentric flue kit 80/125mm
EF100
Vertical Concentric flue kit 100/150mm
EF120
Vertical Concentric flue kit 100/150mm
EF150
Vertical Concentric flue kit 130/200mm
EF180
Vertical Concentric flue kit 130/200mm
8.6.6
C
vertical concentric flue assemblies
33
8.6.7
Vertical terminal installation
When the heater is installed as a Type C
1.
Confirm that the roof flashing is correct for the type of roof through which the terminal is to be installed. (See Section 8.11)
2.
Determine the desired location for the flue terminal, taking into account minimum distances as detailed in Section 8.3.1 and the
relevant British Standards.
3.
Taking care to protect the appliance from debris and dust, drill a hole in the desired location. The diameter of the hole should be no
more than 10mm greater than the diameter of the air supply pipe of the terminal.
NOTE:
The hole should be drilled from the outside to ensure that no damage is done to the roofing material. Extra care should be
taken to ensure that the hole is drilled vertically.
4.
Install the roof flashing and secure as appropriate.
5.
Carefully insert the roof terminal through the roof flashing and hole in the roof.
NOTE:
When inserting the roof terminal do not support or turn the terminal using the cap.
6.
Ensure the terminal is vertical using a spirit level.
7.
Fit the support bracket around the terminal and secure using appropriate fixings. Do not tighten the support bracket.
8.
Install the remainder of the flue system working progressively away from the Water heater supporting the pipes as necessary.
9.
Once the flue system is fully installed, tighten the clamp to secure the terminal in place.
FLUE SYSTEM SPECIFICATION
MANUFACTURER MUELINK & GROL
TEMPERATURE CLASS T120
FLUE GAS MATERIAL PP
EACH VERTICAL CONCENTRIC FLUE ASSEMBLY IS SUPPLIED WITH THE FOLLOWING ITEMS:
CONCENTRIC VERTICAL TERMINAL Ø80/125MM PP
CONCENTRIC EXTENSION Ø80/125mm (500mm) PP CUT TO LENGTH
ADDITIONAL FLUE ITEMS ARE AVAILABLE SEE FLUE ASSEMBLY AND ANCILLARIES GUIDE AT
WWW.LOCHINVAR.LTD.UK
appliance, the flue system should be installed as follows:
33
C
33
Flue Assembly Item number
EFVF002
EFVF004
EFVF004
EFVF005
EFVF005
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents