APOGEE P1 FLN Communication Module (HVAC10)

Note:
Before installing, ensure that the drive and all wiring is electrically isolated and
cannot be made "live" unintentionally by other personnel.
Wait 5 minutes after disconnecting power before working on any part of the
system or removing the covers from the Drive.
You can create a network of drives by linking a Master (PLC or APOGEE controller) to one or
more HVAC10 drives fitted with this module.
Plug this Communication Module on to the front of the HVAC10 drive by removing its terminal
cover and fitting the product to the right-most Technology Box position.
Wiring is very simple - all connections are SELV (Safe Extra Low Voltage).
It is possible to establish serial communications without adhering to the following
recommendations, however, the recommendations will promote greater reliability.
Consult with the Siemens Building Technology office for information on wiring and
cabling.