Unpacking The Base Station - Siemens RUGGEDCOM WIN7237 Installation Manual

Table of Contents

Advertisement

RUGGEDCOM WIN7237
Installation Guide
3.
Unpack and inspect the base station components. For more information, refer to
Base
Station".
4.
Mount the base station to a pole, wall or tower. For more information, refer to
Base
Station".
5.
Install and connect the antenna(s). For more information, refer to
6.
Assemble the PoE cable. For more information, refer to
7.
For Class I, Division 2 hazardous locations only, connect a RUGGEDCOM WIN1210/WIN1212. For more
information, refer to
8.
Make sure the base station is grounded. For more information, refer to
Station".
9.
Connect the base station to a power source and the network. For more information, refer to
"Connecting Power and
10. Seal all cable connections. For more information, refer to
11. Configure the base station. For more information, refer to
Section 2.2

Unpacking the Base Station

The following items are included in the RUGGEDCOM WIN7237 package:
Item
RUGGEDCOM WIN7237 Base Station
Pole/wall/tower mounting kit
DB9 Female to 3-Pin Male RS232 Cable, 2 m (6.6 ft)
Data Adapter
GPS Antenna
Coaxial cable, 350 mm (13.8 in) long
When unpacking the base station, do the following:
1.
Inspect the package for damage before opening it.
2.
Visually inspect each item in the package for any physical damage.
3.
Verify all items are included.
IMPORTANT!
If any item is missing or damaged, contact Siemens for assistance.
Unpacking the Base Station
Section 2.8.4, "Installing the Hazardous Location
Data".
Section 2.5, "Mounting the
Section 2.6, "Installing
Section 2.8.3, "Assembling the PoE
Kit".
Section 2.7, "Grounding the Base
Section 2.9, "Weatherproofing the Base
Section 3.2, "Configuring the Base
Chapter 2
Installing the Base Station
Section 2.2, "Unpacking the
Antennas".
Connector".
Section 2.8,
Station".
Station".
Quantity
1
1
1
1
1
1
7

Advertisement

Table of Contents
loading

Table of Contents