Powering Up The System; Switching On The Bdu - Inmarsat wideye iFleetONE Installation Manual

Table of Contents

Advertisement

iFleetONE™ Terminal Installation Manual

1.10 Powering up the system

1.10.1 Switching on the BDU

Use the ON/OFF switch on the BDU's front panel. It normally takes about 1.5 to 3 minutes for the whole
terminal to be powered up and to register with the satellite network.
Wait for the three LED indicators ("TERMINAL", "ANTENNA" and "REGISTERED") to turn green.
LED Name
TERMINAL
ANTENNA
Status
Steady
Amber
Steady
Green
Steady
Red
Off
Steady
Amber
Blinking
Amber
Blinking
Green
Steady
Green
Steady
Red
No light (Off)
Meaning
Terminal (BDU) is powering up.
Terminal (BDU) has powered up successfully.
Terminal (BDU) has detected a failure state.
Terminal (BDU) is in OFF state.
ADU is powering up.
ADU is calibrating.
System is performing a satellite search.
System has locked on to the satellite.
ADU has detected a failure state.
ADU is in OFF state.
Page 32 of 41

Advertisement

Table of Contents
loading

Table of Contents