Snow Line 560 II, 620 II, 620E II
Use the skid plates to adjust the distance of the
running.
or engine oil.
Take precautions to ensure that discharged snow
ers are not endangered.
Keep hands out of the snow discharge chute while
Assembly
Caution!
Required tools
2 Open-end or ring spanners, size 10
Open-end or ring spanner, size 13
Screwdriver
Spray oil
Assembly sequence
Attaching and adjusting control cables
and auger control cables.
1. Guide the control cable upward:
Guide the auger control cable through the
469186_c
opening on the drive speed selection plate
(
3-1).
Guide the wheel drive control cable upward
under the drive speed selection plate (
2.
(
screw.
3. Raise the clutch lever (
4. Mount the hook into the hole on the clutch lever
5.
-
until there is no slack in the cable (lightly tightened)
(
7-1). Hold the cable while tightening so that it
does not twist.
6. Tighten the lock nut (
-
» The control cables are installed.
Attaching the drive speed selection lever
1.
lever through the drive speed selection plate
(
8-1).
2.
bolt and attach the drive speed selection lever
(
9).
3. Secure the drive speed selection lever with the
the screw yet.
4.
setting (1) (
5.
6.
nut (
10-1).
» The drive speed selection lever is attached.
Attaching the snow discharge chute
1. Lightly lubricate the surface of the snow discharge
chute that slides against the snow blower with
spray oil (
2. Mount the discharge chute (
3.
4-1)
5).
(
6).
7-2).
(
10-1). Do not tighten
8-2).
(
10-2).
11).
11).
GB
3-2).
-
(
12-1).
25
Need help?
Do you have a question about the Snow Line 560 II and is the answer not in the manual?