Vents VUT 180 P5 User Manual page 11

Air handling unit
Hide thumbs Also See for VUT 180 P5:
Table of Contents

Advertisement

Plug
Drain pipe
Drain hole location in case of installation according to the Diagram 1
Then connect the drain pipe to the sewage system using the SG-32 U-trap kit (available upon separate order). The pipes are required to
have a minimum slope of 3°. Each drain pipe is connected to a different U-trap.
min 3°
Drain pipe
U-trap
Drain hose
Sewage system
The condensate drainage system is designed for normal operation in premises with air temperatures above 0 °C! If the expected ambient
air temperatures are below 0 °C, the condensate drainage system must be equipped with heat insulation and pre-heating facilities.
Condensate drainage is not required for the VUE 180 P5(B) (EC) units as they are equipped with an enthalpy heat exchanger.