Installation options according to diagrams 4-5 are possible for the VUE 180 P5B modification.
INTAKE AIR
SUPPLY AIR
Diagram 4. Wall vertical installation
The VUT 180 P5(B) (EC) heat recovery units require condensate drainage.
The hole for the drain pipes is in the cover of the unit.
tooltip
Remove the plug from the hole, open the service panel and install the drain pipe from the delivery set into the hole.
The drain pipes should be installed only in the holes indicated on the diagrams. For suspended and wall mounted horizontal installation
use two holes on the side of the unit, for a wall-mounted vertical installation use a hole at the bottom of the unit. Do not mount the drain
pipes in the holes not indicated on the installation diagram.
10
EXHAUST AIR
EXTRACT AIR
CONDENSATE DRAINAGE
Drain pipe
Drain hole location in case of installation according to the Diagrams 2 and 3
Diagram 5. Wall horizontal installation
Plug
Drain pipe
VUT/VUE 180 P5(B) (EC)
SUPPLY AIR
Plug
www.ventilation-system.com
EXTRACT AIR