JRC Handy Search NJJ-95B Instruction Manual page 4

Table of Contents

Advertisement

FCC NOTICES:
This device complies with part 15 of the FCC Rules:
Operation is subject to the following conditions:
1. This device many not cause harmful interference, and
2. This device must accept any interference received, Including interference that
may cause undesired operation
Warning:
Changes or modifications to this unit not expressly approved by the party
responsible for compliance could void the user's authority to operate the
equipment.
Operation of this device is restricted to law enforcement, fire and rescue
officials,scientific research institutes, commercial mining companies, and
construction companies. Operation by any other party is a violation of 47
U.S.C. § 301 and could subject the operator to serious legal penalties.
Coordination Requirements.
(a) UWB imaging systems require coordination through the FCC before the
equipment may be used. The operator shall comply with any constraints on equipment
usage resulting from this coordination.
(b) The users of UWB imaging devices shall supply detailed operational areas to
the FCC Office of Engineering and Technology who shall coordinate this information with
the Federal Government through the National Telecommunications and Information
Administration. The information provided by the UWB operator shall include the name,
address and other pertinent contact information of the user, the desired geographical
area of operation, and the FCC ID number and other nomenclature of the UWB device.
This material shall be submitted to the following address:
(d) Users of authorized, coordinated UWB systems may transfer them to other qualified
users and to different locations upon coordination of change of ownership or location to the FCC
and coordination with existing authorized operations.
(e) The NTIA/FCC coordination report shall include any needed constraints that
apply to day-to-day operations. Such constraints could specify prohibited areas of
operations or areas located near authorized radio stations for which additional
coordination is required before operation of the UWB equipment. If additional local
coordination is required, a local coordination contact will be provided.
(f) The coordination of routine UWB operations shall not take longer than 15
Frequency Coordination Branch., OET
Federal Communications Commission
445 12th Street, SW
Washington, D.C. 20554
ATTN: UWB Coordination
iii

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents