Siemens SINAMICS BOP-2 Operating Instructions Manual page 40

Basic operator panel
Hide thumbs Also See for SINAMICS BOP-2:
Table of Contents

Advertisement

Setup
Finish
Confirms the end of the commissioning process. The
Inverter will perform a motor calculation change all the
relevent parameters within the Control Module
1. Press
2. Using the
3. Press
Busy
The display during the process of changing the
parameter information of the Inverter will display
"BUSY".
Done
When the commissioning process is completed, the
BOP-2 will display "DONE". If a problem has occured or
there has been an interruption to the final process then
the BOP-2 will display "FAILURE". Should this happen,
the Inverter is to be considered unstable and the reason
for the failure should be investigated and the
commissioning process restarted.
40
to modify the parameter value.
and
keys to select Yes or No.
to confirm the selection and complete the
commissioning process.
MONITORING
MONITORING
PARAMETER
PARAMETER
MONITORING
MONITORING
FINISH
PARAMETER
PARAMETER
MONITORING
MONITORING
- BUSY -
PARAMETER
PARAMETER
MONITORING
MONITORING
- DONE -
PARAMETER
PARAMETER
Basic Operator Panel 2 (BOP-2)
Operating Instructions, 2010-03-01, A5E02778927A AB
CONTROL
CONTROL
DIAGNOSTICS
DIAGNOSTICS
FINISH
SETUP
SETUP
EXTRAS
EXTRAS
CONTROL
CONTROL
DIAGNOSTICS
DIAGNOSTICS
YES
SETUP
SETUP
EXTRAS
EXTRAS
CONTROL
CONTROL
DIAGNOSTICS
DIAGNOSTICS
SETUP
SETUP
EXTRAS
EXTRAS
CONTROL
CONTROL
DIAGNOSTICS
DIAGNOSTICS
SETUP
SETUP
EXTRAS
EXTRAS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents