Code
Meaning
F.1100
Immersion heater: Safety cut-out
open
F.1117
Compressor: Phase failure
F.1120
Immersion heater: Phase failure
F.9998
Connection fault: Heat pump
J
5.4 kW back-up heater
Applies for products with a heat output of 5 kW and 7 kW
Internal control of the output
levels
0
1
2
3
4
5
6
7
8
K
8.54 kW back-up heater at 230 V
Applies for products with a heat output of 12 kW
Internal control of the output
levels at 230 V
0
1
2
3
4
5
6
0020257319_02 Hydraulic station Installation and maintenance instructions
Cause
The safety cut-out on the electric back-
up heater is open due to:
Insufficient volume flow or air in the
building circuit
The immersion heater is operated
when the building circuit is not filled
Immersion heater operation at flow
temperatures above 95 °C trips the
safety fuse of the safety cut-out and
requires that the fuse be replaced
Feed-in of external heat into the
building circuit
Defective fuse
Incorrect electrical connections
Mains voltage too low
Compressor/low tariff power supply
not connected
Blocked by energy supply company
for over three hours
Electric back-up heater defective
Poorly tightened electrical connec-
tions
Mains voltage too low
eBUS cable not connected or con-
nected incorrectly
Outdoor unit without supply voltage
Power consumption
0.0 kW
0.9 kW
1.1 kW
1.7 kW
2.0 kW
2.8 kW
3.7 kW
4.5 kW
5.4 kW
Power consumption
0.0 kW
0.7 kW
1.2 kW
1.8 kW
2.2 kW
3.2 kW
3.8 kW
Remedy
Set value
1 kW
2 kW
3 kW
4 kW
5 kW
6 kW
Set value
1 kW
2 kW
3 kW
4 kW
Appendix
Check the circulation in the building
circuit pump
If required, open the stopcocks
Replace the safety cut-out
Reduce or stop the external heat
that is entering
Check that the dirt filter that is in
place is permeable
Check the fuse
Checking the electrical connections
Check the voltage at the heat pump
electrical connection
Reduce energy supply company
anti-cycling time to under three hours
Check the electric back-up heater
and its power supply
Check the electrical connections
Measure the voltage at the electrical
connection for the electric back-up
heater
Check the connection pipes between
the power supply PCB and control
PCB on the indoor and outdoor unit
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents