Download Print this page

Toro Z Master series Setup Instructions page 2

Hide thumbs Also See for Z Master series:

Advertisement

Procedure
15
16
17
18
19
20
21
1
Removing the Machine from a
Crate
Parts needed for this procedure:
2
Rear wheels (Wooden crate only)
Removing a Machine from a Metal Crate
If removing the machine from a metal crate, refer to the
Dealer/Distributor Portal for further information.
Removing the Machine from a Wooden
Crate
1. Remove the screws holding the right angle retaining
plate to the crate.
Description
Bolt (1/2 x 3-1/4 inch)
Locknut (1/2 inch)
Roll-Over Protection System (ROPS) Kit
Roll bar, right section
Roll bar, left section
Roll bar, center section
Bolt (3/8 x 1 inch)
Curved washer
Flange nut (3/8 inch)
Bolt (1/2 x 3–1/4 inch)
Flange nut (1/2 inch)
Number 2 general-purpose lithium-base
or molybdenum-base grease. (Purchase
separately.)
No parts required
No parts required
Operator's Manual
Engine Owner's Manual
Registration card
Operator-training material
Key
Qty.
1
Install the ROPS hardware (LPG
machines only).
1
Install the ROPS (International
1
machines using gasoline only).
1
1
1
8
Install the ROPS (Diesel machines
only).
8
8
2
2
1 tube
Check the machine for grease.
Remove the shipping straps.
Check the machine before delivery to
the customer (All machines).
1
1
Delivering the machine to the customer
1
(All machines).
1
2
Gasoline Machine Shown
Diesel Machine Shown
2
Use
Figure 1
Figure 2

Advertisement

loading