Primera FX1000 Operator's Manual page 7

Matrix removal system
Table of Contents

Advertisement

4. In the supply box, locate the supply mandrel, 3mm Allen wrench and the bottle of
Loctite.
5. Partially remove the two set screws on the mandrel so that approximately ½ inch (1
cm) is exposed. Crack the top off the Loctite container and place two drops on each
set screw. Reset each screw until it is flush with the outside of the mandrel. Attach
the mandrel to the unwinder (left side) drive shaft. Line up the holes in the chuck with
the flat edges on the drive shaft. The holes must correspond with the flats or the set
screws will not hold the chuck in place.
6. Tighten the set screws using the 3mm Allen
wrench. Once they are tight, attempt to rotate
the mandrel forward and backward while
watching the drive shaft. The drive shaft should
move with the mandrel. If it does not move with
the mandrel, loosen the set screws slightly and
turn the mandrel until the set screws are even
with the flats. The Loctite will dry in 24 hours.
7. Connect the power cable and switch on the
unit.
7

Advertisement

Table of Contents
loading

Table of Contents