Page 2
The process of ventilation shaft attachment is shown on Pic. 5-6. Air flow direction should match the direction of an arrowhead placed on the fan case. 5. Connect air ducts 6. Fix air ducts with clamps Bodor Vents, LLC DBA: VENTS-US 11013 Kenwood Road Cincinnati, Ohio 45242 Phone: (513)348-3853 MIU_15,16_VKP,VKPF-01 e-mail: sales@ventsus.com...
Page 3
(Pic.4); brown - place back the clamping bar, tighten up the lug and install the cover on the terminal box (Pic.5). Bodor Vents, LLC DBA: VENTS-US 11013 Kenwood Road Cincinnati, Ohio 45242 Phone: (513)348-3853 MIU_15,16_VKP,VKPF-01 e-mail: sales@ventsus.com...
Page 4
(Pic.9); brown - fix the inspection cover on the case using the butterfly screw (Pic.10). Bodor Vents, LLC DBA: VENTS-US 11013 Kenwood Road Cincinnati, Ohio 45242 Phone: (513)348-3853 MIU_15,16_VKP,VKPF-01 e-mail: sales@ventsus.com...
Need help?
Do you have a question about the VKP 100 and is the answer not in the manual?
Questions and answers