Once 'Replace Control Board' is selected the Com Port Configuration option will appear,
complete the configuration and click Next. You will see the bellow window.
Fill in the below and click Next.
1. Scale Serial Number.
2. Model number.
3. Load Cell Serial Number.
4. Point to the Analyzer and load cell image file provided by OHAUS.
5. Click Next to complete the Replace Control Board process.
Note: After completing the information above and clicking next, you will hear a beep from the
Analyzer and the Analyzer will display the message below. Wait until the download process is
completed then ONLY PRESS the 'OK' button on the Analyzer display in order for the Analyzer
to re-boot (a normal re-boot takes about 20-30 sec.).
MB90 MB120 Series Service Manual
APPENDIX B SOFTWARE SERVICE TOOL INSTRUCTIONS
75
Ohaus Corporation www.ohaus.com