Table Of Contents - Generac Power Systems TTS Series Owner's Manual

Ilc-200 integrated load center
Hide thumbs Also See for TTS Series:
Table of Contents

Advertisement

Introduction ..................................................................1
Safety Rules .................................................................1
Safety Symbols and Meanings ...................................2
Unpacking .....................................................................3
Equipment Description ................................................3
Service Disconnect ......................................................3
Transient Voltage Surge Suppression .........................3
Automatic Transfer Switch ..........................................4
Panel Board .................................................................4
Transfer Mechanism ....................................................4
Ratings-Data Label ....................................................5
Panel Board Enclosure ................................................5
Safe Use of Transfer Switch .......................................5
Transfer Switch Mechanism ........................................5
Transfer Switch Data Decal .........................................5
Introduction to Installation ..........................................7
Mounting the Enclosure ..............................................7
2-Pole Mechanism .......................................................7
Connecting Start Circuit Wires ...................................8
On-Site Generator Connections ..................................8
Battery Charger ............................................................9
Auxiliary Contacts .......................................................9
Functional Tests and Adjustments ..........................11
Manual Operation .......................................................11
Close to Normal Source Side ....................................11
Close to Generator Source Side ...............................12
Return to Utility Source Side .....................................12
Voltage Checks ..........................................................12
Utility Voltage Checks ...............................................12
Generator Voltage Checks ........................................13
Main Contacts at Normal (Utility) ..............................14
Main Contacts at Neutral ...........................................14
Automatic Transfer Switch Owner's Manual

Table of Contents

Sequence of Operation ..............................................15
Sequence 2 - Line Interrupt Delay .............................15
and Warmup Timers ..................................................15
Sensors .....................................................................15
Sequence 5 - Voltage Pickup ....................................15
Sequence 6 - Return to Utility Timer .........................15
The Human Machine Interface (HMI) ........................16
Home Screen ..............................................................16
Status ........................................................................16
Sequence of Operation Settings ...............................17
Pushbutton Arrow ......................................................17
Configuration Menu ...................................................17
Transfer Switch Settings #1 ......................................18
Transfer Switch Settings #2 ......................................18
Transfer Switch Settings #3 ......................................19
Transfer Switch Settings #4 ......................................19
Exercise and Clock Setup .........................................19
Exercise Setup ..........................................................20
Manual Tests .............................................................20
Input/Output Signal Maintenance ..............................21
Voltage Measurement Display ..................................21
Voltage Measurement Maintenance ..........................21
System Status ...........................................................21
System Utility Menu #1 ..............................................22
System Utility Menu #2 ..............................................22
Generator Tests Under Load ....................................23
Checking Automatic Operation ................................23
Installation Summary .................................................23
Operate Transfer Switch ...........................................25
Clean and Inspect Transfer Switch ..........................25
Main Current Carrying Contacts ...............................25
Twelve-Volt Batteries (Two) ......................................25
Lubrication .................................................................25
iii

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

004892004877

Table of Contents