3.3 Electrical connectors and plumbing access ports

Figure 6 Electrical connectors and fittings
1 Analyzer access ports
2 Power and data connections (factory installed)
3 Tubing or cables

3.4 Plumbing

3.4.1 Sample line guidelines

5
Use the sealing plug to close access ports that are not used.
Figure 6
shows the electrical connectors and fittings on the instrument. Use the tubing
plug to put tubing or cables through the analyzer access ports. To keep the environmental
rating of the enclosure, make sure that there is a sealing plug in the access ports that are
not used.
Refer to
System configuration options
installation.
Fire hazard. This product is not designed for use with flammable liquids.
Do not install reagents until all plumbing is complete.
Make sure to use the specified tubing size.
Select a good, representative sampling point for the best instrument performance. The
sample must be representative of the entire system.
To prevent erratic readings:
Collect samples from locations that are sufficiently distant from points of chemical
additions to the process stream.
on page 16 to find the correct plumbing
4 Tubing plug
5
5 Sealing plug
.
D A N G E R
N O T I C E
Installation
15