Checklist for Installation
1)
Consider the expected operating temperature.
2)
Mount the unit. Secure fastening screws.
3)
Install the service unit (filter, mist lubricator, regulator, as required),
valve and supply line.
7 Start-Up / Operation
The start-up of the vibrators is possible
immediately after correct installation.
After filling the mist lubricator with oil,
the vibrator can be started and the
required
drops/min
lubricator. We recommend Klüber
Standard Installation
Detailed drawings are available upon request.
Die NTP B+C vibrators may only be operated in timed mode.
A 60 second (max.) duty time must be followed by a 60 second (min.)
pause. Alternatively, short duty times (≤ 12 seconds) may be used with a
pause factor of 5. (Example: 5 seconds duty – 25 seconds pause).
Mist lubricator: Adjust the number of drops with the vibrator running
NTP 25: 0-1 drop/min
NTP 32: 1-2 drops/min
NTP 48: 1-2 drops/min
set
on
the
12
„AIRPRESS 15" oil for operating
temperatures of up to 60°C.
Attention: Reduced cross sections
cause throttling (pay attention to
nominal widths).