Inlet port
Outer part
STEP 7
Fitting Ring
Tighten the fitting barbs in clockwise direction until the gasket underneath
is compressed.
The installation of the CPU water block is now complete.
Fitting Barb
Outlet port
With EK-Velocity series water blocks it is mandatory to use the port that
is nearest to the center of the water block as INLET port. Mixing the ports
may result in less than ideal thermal performance of the water block.
STEP 7
Inner core
(removable)
STEP 8
- 8 -
Before proceeding with the installation It is mandatory
to remove the protective foil from the backside of the
water block.
Need help?
Do you have a question about the Velocity-AMD and is the answer not in the manual?