Operation; Inspection Before Operation; Grid-Tied Operation - AEG AS-IR01 Installation Instructions Manual

Single-phase grid-tied solar inverter
Table of Contents

Advertisement

23

4. Operation

The following section describes the detailed operation of the inverter, covering pre-inspection operation, grid-tied
operation, stopping and inverter maintenance.

4.1 Inspection before operation

Make sure that the following steps are observed before operation:
1.
Ensure that the installation site meets the requirements mentioned in section 3.2.2 for easy installation, remov-
ing, operation and maintenance;
2.
Ensure that the mechanical installation meets the requirement mentioned in section 3.4;
3.
Ensure that the electrical installation meets the requirement mentioned in section 3.5;
4. Ensure all the switches are on "off" position;
5.
Ensure that the voltage meets the requirement mentioned in section 2.4;
6. Ensure that all electrical safety indications are clearly identifiable at the installation site.

4.2 Grid-tied operation

The following section describes the detailed operation of the inverter, covering the inspection before operation, grid-
tied opera.
Please start the inverter as follows:
1.
Ensure the requirements mentioned in section 4.1 are met;
2.
Switch on the breakers at the AC side;
3.
Switch on the integrated DC switch;
4. Switch on the switch on the DC side;
5.
Observe the LED indicators and information displayed on the screen. Refer to chapter 5 for detailed infor-
mation.
PD201806 AEG GRID-TIED SINGLE-PHASE SOLAR INVERTER V.1-18 EN
Before operation always check if the solar plant or the inverter need any installation,
repairing, refitting or maintenance.
When the inverter is powered for the first time, please refer to section 5.5
for grid certification choice. Keep the inverter turned on at least 30 minutes to
allow for charging of the internal clock battery.