Operation Panel - AEG AS-IR01 Installation Instructions Manual

Single-phase grid-tied solar inverter
Table of Contents

Advertisement

27
Inverter state
Manual turn off

5.2 Operation panel

The following drawings and instructions only apply if you have optionally ordered AS-IR01 and AS-IR01-2 with LCD
display. Only in models with optional LCD display, there are 4 buttons on the panel:
1.
"ESC", exit and return ;
2.
" ", back to the front page and data increasing;
3.
" ",to the next page and data decreasing;
4.
The machine can be turned on and off by pressing the buttons: press "ESC" and "ENT" (about 3 seconds) at the same
time; this activates the quick start-up and stop function.
PD201806 AEG GRID-TIED SINGLE-PHASE SOLAR INVERTER V.1-18 EN
LED indicators
Please refer to chapter 5 and 7 for detailed fault information and troubleshooting.
"ENT", enter.
Hardware or software fault (E003, E004, E005, E008, E009,
E011, E013 or E015). De-couple the inverter from the system
before maintenance.
Red indicator is on, others are off :
Current-leakage or unqualified output power energy of the
inverter (E007, E010, E014, E017, E018 or E020). De-couple the
inverter from the system before maintenance.
All indicators are on:
Stop after the communication or panel command.
Table 15: Inverter states
Description
27