4.4 Installation Overview
4.4.1 Installation Flow
The installation of R8860E GU858 includes two parts, that is, main part installation and
cable installation. The installation flow is shown in
Figure 4-3 R8860E GU858 Installation Flow
4.4.2 Hoisting Operation Instructions
If it is required to hoist RRU to the tower, refer to the following instructions.
Prerequisites
l
Natural conditions for hoisting operation are satisfied, such as no fog and high visibility.
The hoisting operation is prohibited in windy, snowy, or rainy days.
l
Tools for hoisting operation are available, such as the hoisting rope (with a bearing
capacity of 100 kg) and the crown block, and the crown block is firmly installed in
appropriate position on the tower.
l
Open the package to check whether the cabinet is in good condition. Hoist the cabinet
to the tower after the inspection.