Zte ZXSDR R8860E GU858 User Manual page 49

Outdoor gsm&umts dual mode macro rru
Table of Contents

Advertisement

Chapter 4 Installation
Figure 4-5 Binding Cabinet with Rope
3. When performing the hoisting operation, two persons stand at the foot of the tower.
One pulls the rope slowly, the other one releases the rope slowly and prevents the
cabinet from touching the tower, protecting the heat sink device and the cabinet, as
shown in
Figure
4-6.
4-19