Handle Installation; Wheel Installation - Chicago Electric 92280 Assembly And Operating Instructions Manual

10,000 watt (11,000 peak) generator with 18 hp robin engine
Table of Contents

Advertisement

When unpacking, check to make sure that all the parts are included. refer to the assembly
section, and the assembly drawing and Parts list at the end of this manual. if any parts
are missing or broken, please call Harbor Freight Tools at the number on the cover of this
manual as soon as possible.
Before operating the generator, the following items have to be installed: Wheel kit, Battery,
Muffler, and Handles.
1.
Unpack and review all parts for defects or missing items.
2.
Find two Handles (11), two Handle Pins (31), and two Hex nuts (28).
3.
insert the Handle Pin through the Handle bracket and Frame (4) as shown below.
4.
Where the Handle Pin protrudes from the Frame, screw on and tighten the Hex nut
(28).
5.
install the other Handle by following steps 1 through 4 on the other side of the Frame.
1.
Find two Wheels (25), two axles (24), two Hex Bolts (27), and two Cotter keys (32).
2.
With the help of another strong person, lift the engine end of the Generator assembly
high enough to insert two, six inch blocks under each side of the Frame (4) as shown
below, right.
axle (24)
skU 92280
UNPACKING
ASSEMBLY INSTRUCTIONS

Handle Installation

Frame (4)
Hex nut (28)

Wheel Installation

nut
axle retainer
For technical questions, please call 1-800-444-3353
Handle (11)
Handle Pin (31)
Cotter key (32)
Page 10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents