Stand 01/2019 Liftboy 1/2/3 Handbook Table of content PRODUCER ......................... 3 UTILISATION ........................3 IMPORTANT / WARNINGS ....................4 UNPACKING AND PREPARATION ..................4 ASSEMBLY BEFORE STARTING UP ................4 DESCRIBTION OF OPERATION ..................7 ...
Stand 01/2019 Liftboy 1/2/3 Handbook Producer Lehner Lifttechnik GmbH A – 4724 Neulirchen am Walde, Salling 8 Tel: +43.7278.3514-15, Fax: +43.7278.3514-12 E-mail: office@lehnerlifttechnik.at Web: www.lehner-lifttechnik.at Utilisation This manual provides information on the technical properties, installation methods, usage of the device and maintenance procedures for the Liftboy models type 1, 2 and 3.
Important / Warnings Please read the whole manual, before the platform is operated The installation of the platform is only allowed by Lehner Lifttechnik or a qualified staff recommended by Lehner Lifttechnik. The maximum load capacity of each model must not be exceeded.
Stand 01/2019 Liftboy 1/2/3 Handbook Assembly before starting up Fixing on safety edge on side opposite actuator The assembly screws are pre-assembled on the platform. They will be screwed off. The safety rail will be mounted on the platform surface. The screws need to be tightened.
Page 6
Stand 01/2019 Liftboy 1/2/3 Handbook Fixing of the rail on actuator side 1. The assembly screws are pre-assembled on the upper board. They will be screwed off. 2. The safety rail will be mounted on the upper board. The screws will be tightened.
Stand 01/2019 Liftboy 1/2/3 Handbook Describtion of Operation The handheld controller or the fixed control button on a column can be mounted at the platform by the user of the platform. Operation buttons and the symbols are easy to understand.
Disassambly & Transport It is possible to deconstruct the platfform for the transport and the storage; platform, rails and access ramp. The company Lehner Lifttechnik recommends to transport the platform in the original packing. Plattform Lift Seite 8 of 10...
Stand 01/2019 Liftboy 1/2/3 Handbook Maintenance The platform has to be undergone an attendance at least once a year due to the national law. Maintenance has to be done through dealers authorized by Lehner Lifttechnik. The platform has a durability of about 10 years with regular, daily use. After this period the lifting platform has to be assessed by specialized staff in order to evaluate the further application.
Stand 01/2019 Liftboy 1/2/3 Handbook Error search 1. Is the connector from the electric power supply put into the electrical socket? 2. Does the socket have electricity? 3. Electric power supply there? Maybe the fuse is damaged? 4. Is the connector connection between the electric power supply and the platform made correctly? 5.
Need help?
Do you have a question about the Liftboy 1 and is the answer not in the manual?
Questions and answers