With stage 3 delay (STG3 DLY) in Advanced setup menu can turn on second stage of mechanical cooling Y2 –O after the delay if the call for Y1 ---I and Y2 ---I
have not been satisfied.
Table 12 – Enthalpy Operation With DCV (CO
Demand
Outside Air ---
Controlled
Good to
Ventilation
economize?
(DCV)
No
Below set
Yes
No
Above set
Yes
*
With stage 3 delay (STG3 DLY) in Advanced setup menu can turn on second stage of mechanical cooling Y2 –O after the delay if the call for Y1 ---I and Y2 ---I
have not been satisfied.
[
With 2SP FAN DELAY (Advanced Setup Menu) when in the economizing mode there is a delay for the high speed fan to try to satisfy the call for second
stage cooling by turning on the fan to high and opening the OA damper 100% before the first stage mechanical cooling is enabled.
Preferred 15-16 seer 2-stage packaged air conditioner and gas furnace system with puron (r--410a) refrigerant single and three phase 2--5 nominal tons (sizes 24--60) (74 pages)