Receiving and Unpacking

1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to Condair within 48 hours from receipt of goods.
Condair assumes no responsibility for any material shortages beyond this period.
Note: A steam valve, actuator, and wye strainer are shipped along with the SETC/P
humidifier but in separate small boxes.
3 Inspect shipment for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper
promptly.
5 All Condair products are shipped on an FOB factory basis. Any and all damage, breakage
or loss claims are to be made directly to the shipping company.
Before Installation
1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier's specification label.
2 If steam supply is from a Medium or High Pressure boiler ensure supply steam line includes
a relief valve to prevent supply pressure from exceeding 15 psig.
3 Ensure means for returning boiler steam condensate to boiler at atmospheric pressure are
available.
4 Ensure sufficient clearances will be available as described in Location on page 11.
5 Ensure steam lines can be routed to distributor SAM-e manifold or blower pack as described
in Steam Lines and Condensate Returns on page 17.
6 Report any discrepancy immediately to the site engineer.