Installation - EBARA DMLEU Operating Instructions, Installation & Maintenance Manual

Submersible single channel sewage pump
Table of Contents

Advertisement

Ebara Submersible Single Channel Sewage Pumps
Operating, Installation and Maintenance

Installation

1. before installation:
a.) Use a megger to measure the insulation resistance between the ground wire and each phase of the motor.
Keep the ground wire off the ground during measurement. The value of each reading should be more than
20 meg-ohms.
2. Pump Installation:
a.) Using a chain or lifting cable assembly, lower the pump into the tank or wet well.
DO NOT USE THE POWER & SENSOR CABLE TO LIFT PUMP.
b.) Do not install the pump horizontally. Ensure that the pump is upright and on a secure base. Installation of pump
with Quick Discharge Connector (QDC) shall be in accordance with manual entitled "Quick Discharge Connector."
c.) Install pump in a location within the tank that has the least amount of turbulence.
d.) Support the discharge piping to prevent vibration.
e.) Install proper ventilation so that air will not become stagnant.
f.) Do not permit the end of the discharge piping to become submerged, as it will result in backflow when the pump stops.
g.) Set control operating levels (i.e. floats) so that pump is not running for more than ten minutes with water level at
minimum operating level as indicated in below chart. Continuous operation of pump at minimum water level will
result in automatic cut-off switch in motor to be activated.
Ebara Fluid Handling
www.pumpsebara.com
(803) 327-5005 • (803) 327-5097 (fax)
Motor Size
(HP)
3
5
H2 (in)
21
/
24
/
9
11
16
16
H1 (in)
11
11
Figure 2
DMLEU
7.5
10
15
20
27
/
27
/
30
/
30
/
13
13
3
3
16
16
8
8
12
/
12
/
12
/
12
/
3
3
15
15
16
16
16
16
30
32
/
5
8
13
/
1
16
4
rev. 01/13

Advertisement

Table of Contents
loading

Table of Contents