EBARA DMLEU Operating Instructions, Installation & Maintenance Manual page 5

Submersible single channel sewage pump
Table of Contents

Advertisement

Ebara Submersible Single Channel Sewage Pumps
Operating, Installation and Maintenance
Installation
3. Electrical Wiring:
Check that the power is locked off and disconnected before working on pump. all electrical work should be
performed by a qualified electrician and all national and local electrical codes must be observed.
(1) Wiring
a) Wire as indicated for the appropriate start system as shown in the following Wiring Diagrams.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.
c) Do not allow the end of the cables to become immersed in water.
d) Make sure pump is properly grounded using the green ground wire in the power cable. Do not connect the green wire
to the power supply.
Output 3HP
208/230V
460V
Ebara Fluid Handling
www.pumpsebara.com
(803) 327-5005 • (803) 327-5097 (fax)
WARNINg
DMLEU
5
rev. 01/13

Advertisement

Table of Contents
loading

Table of Contents