Step 14 - Adjust Factory Installed Options; Step 15 - Install Accessories; Step 16 - Check Belt Tension - Bryant 581J-04A Installation Instructions Manual

Single package rooftop gas heat/electric cooling unit with puron (r-410a) refrigerant
Hide thumbs Also See for 581J-04A:
Table of Contents

Advertisement

Step 14 — Adjust Factory-Installed Options
SMOKE DETECTORS — Smoke detector(s) will be con-
nected at the Controls Connections Board, at terminals marked
"Smoke Shutdown." Cut jumper JMP 3 when ready to ener-
gize unit.
ECONOMI$ER IV OCCUPANCY SWITCH — Refer
to Fig. 65 for general EconoMi$er IV wiring. External occu-
pancy control is managed through a connection on the Controls
Connections Board.
If external occupancy control is desired, connect a time
clock or remotely controlled switch (closed for Occupied, open
for Unoccupied sequence) at terminals marked OCCUPANCY.
Cut jumper JMP 2 to complete the installation.
Step 15 — Install Accessories —
include:
• Roof Curb
• Thru-base connection kit (must be installed before unit is
set on curb)
• LP conversion kit
• Flue discharge deflector
• Manual outside air damper
• Two-Position motorized outside air damper
• EconoMi$er IV (with control)
• EconoMi$er2 (without control/for external signal)
• Power Exhaust
• Differential dry-bulb sensor (EconoMi$er IV)
• Outdoor enthalpy sensor
• Differential enthalpy sensor
• CO
sensor
2
• Louvered hail guard
• Motormaster
head pressure controls
®
• Phase monitor control
• Energy Recovery Ventilator (ERV)
Economizer
Fig. 65 — EconoMi$er
Available accessories
47
2 Position Damper
®
IV Wiring
Refer to separate installation instructions for information on
installing these accessories.
Step 16 — Check Belt Tension —
span length as shown in Fig. 66. Calculate the required deflec-
tion by multiplying the belt span length by
the belt span length is 32 inches: 32 x
BELT FORCE — DEFLECTION METHOD — Check
the belt tension with a spring-force belt force deflection gauge
(available from drive belt manufacturer).
1. Place a straightedge along the belt between the two
pulleys. Measure the distance between the motor shaft
and the blower shaft.
2. Set the tension gauge to the desired tension (see Table 1
in Fig. 66). Place the large O-ring at that point.
3. Press the tension checker downward on the belt until the
large O-ring is at the bottom of the straightedge.
4. Adjust the belt tension as needed.
Adjust belt tension by loosing the motor mounting plate
front bolts and rear bolt (see Fig. 67) and slide the plate to-
wards the fan (to reduce tension) or away from the fan (to in-
crease tension). Ensure the blower shaft and motor shaft are
parallel to each other (pulleys aligned). Tighten all bolts se-
curely when finished.
Unit Without Economizer or
2 Position Damper
Measure
the
belt
1
/
. For example, if
64
1
/
=
1
/
inch deflection.
64
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Preferred series581j-06a581j-05a

Table of Contents