Start-Up Checklist - Bryant 581J-04A Installation Instructions Manual

Single package rooftop gas heat/electric cooling unit with puron (r-410a) refrigerant
Hide thumbs Also See for 581J-04A:
Table of Contents

Advertisement

START-UP CHECKLIST FOR 581J 04-06 SINGLE PACKAGE ROOFTOP
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding
sections of this Installation Instruction document.
I. PRELIMINARY INFORMATION
MODEL NO __________________________________________________
JOB NAME __________________________________________________
SERIAL NO __________________________________________________
ADDRESS ___________________________________________________
START-UP DATE______________________________________________
TECHNICIAN NAME__________________________________________
ADDITIONAL ACCESSORIES
___________________________________________________________________________________________________________________
II. PRE-START-UP
Verify that all packaging materials have been removed from unit (Y/N) _____
Verify installation of outdoor air hood (Y/N) _____
Verify installation of flue exhaust and inlet hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Verify gas pressure to unit gas valve is within specified range (Y/N) _____
Check gas piping for leaks (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify that scroll compressors are rotating in the correct direction (Y/N) _____
Verify installation of thermostat (Y/N) _____
Verify that crankcase heaters have been energized for at least 24 hours (Y/N) _____
III. START-UP
ELECTRICAL
Supply Voltage
Compressor Amps 1
Compressor Amps 2
Supply Fan Amps
TEMPERATURES
Outdoor-air Temperature
Return-air Temperature
Cooling Supply Air Temperature
Gas Heat Supply Air
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
GAS HEATING/ELECTRIC COOLING UNIT
(REMOVE AND USE FOR JOB FILE)
L1-L2_____________
L1 _____________
L1 _____________
L1 _____________
_____________ °F DB (Dry Bulb)
_____________ °F DB
_____________ °F
_____________ °F
L2-L3_____________
L2 _____________
L2 _____________
L2 _____________
_____________ °F WB (Wet Bulb)
CL-1
L3-L1_____________
L3 _____________
L3 _____________
L3 _____________
Catalog No: II581J-4-6-01
Replaces: II581J-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Preferred series581j-06a581j-05a

Table of Contents