Operation; General; Use Of The Control Panel; Browsing In The Menus - DeDietrich ALEZIO O HYBRID User Manual

Hybrid air/water
Hide thumbs Also See for ALEZIO O HYBRID:
Table of Contents

Advertisement

5 Operation

5
Operation
5.1

General

5.2

Use of the control panel

Fig.21
MW-2000369-1
Fig.22
Fig.23
Fig.24
MW-2000371-1
28
200 ESL HYBRID
Once the indoor module has been connected to the boiler, the unit is
managed from the boiler control panel. No action need be taken directly
on the indoor module.
The boiler control panel:
displays every item of information on the hybrid heat pump as a whole
(indoor module, boiler and outdoor unit)
displays the PCB on which a parameter has to be set:
is used to make the settings required for the hybrid heat pump to run.
5.2.1
Press any key to turn on the backlight for the control panel screen.
If no key is pressed within 3 minutes, the control panel backlight will go
out.
Press the 2 right-hand keys together to access the different menus:
Tab.15
Press the
access the next menu,
access the next sub-menu,
access the next parameter,
MW-1000576-1
increase the value.
Press the
access the previous menu,
access the previous sub-menu,
access the previous parameter
MW-2000370-1
decrease the value.
Press the confirmation key
a menu,
a sub-menu,
a parameter,
a value.
Heat pump control system PCB (EHC-02)
PCB for managing the second circuit (SCB-04)

Browsing in the menus

Menus available
Information menu
User menu
Installer menu
Manual Forcing menu
Malfunction menu
COUNTERS sub-menu
TIME PROG sub-menu
CLOCK sub-menu
PCB selection menu
Important
The icon is displayed only if an optional PCB has
been installed.
Important
The different menus are only accessible when the icons flash.
key to:
key to:
to confirm:
7613346 - v05 - 13112018

Advertisement

Table of Contents
loading

This manual is also suitable for:

200 esl hybrid 4–8200 esl hybrid 11–16

Table of Contents