Baxi LUNA HT 1.450 Installation And Servicing Instructions page 22

Condensing gas fired wall hung boiler
Table of Contents

Advertisement

Available languages

Available languages

Separated flue terminals
installation options
Fig. 13
A
INSTALLATION AND SERVICING INSTRUCTIONS
L max = 49.20 ft / 15.0 m
L max = 32.80 ft / 10.0 m
Fig. 14
1. Take Baxi Ht dual flue spring clamp with the larger hole in
it and place it onto the male end of the pipe.
2. Slide clamp all the way down the pipe with the smaller
opening of the clamp towards the female end of the pipe.
3. Bend the clamp over the female end of the pipe "A" and
slide the male end of pipe "B" through the clamp and also
into the female end of pipe "A".
Note:
The clamp is needed for Baxi Ht dual flue pipe
B
Note:
The dual flue spring clamp is for indoor use only and should
not be used in an outdoor application
22
L max = 45.92 ft / 14.0 m
7110242.02 - en

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna ht 1.650

Table of Contents